Proton Plan Design Handbook
Executive Summary
1. Introduction
1.1 Motivation
1.2 Present Operational Limitations
1.3 Strategy
2. Elements of the Plan
2.1 Work Breakdown Structure (to be updated)
2.2 Subprojects
WBS 1.1 - Linac Upgrades
WBS 1.1.1 - Linac PA Vulnerability
WBS 1.1.2 - Linac Quad Power Supplies
WBS 1.1.4 200 Mhz LLRF Upgrade
WBS 1.2 - Booster Upgrades (to be updated)
WBS 1.2.1 - Determination of Booster Rep Rate Limit & Reliability Issues
WBS 1.2.2 - ORBUMP System
WBS 1.2.3 - Corrector System
WBS 1.2.4 - 30 Hz Harmonic Upgrade
WBS 1.2.5 - Gamma-t System
WBS 1.2.7 - Drift Tube Cooling
WBS 1.2.11 - Booster Dump Relocation
WBS 1.2.12 - Booster Chopper
WBS 1.2.13 - Booster RF Improvements
WBS 1.3 - Main Injector Upgrades
WBS 1.3.1 - Large Aperture Quadrupoles
WBS 1.3.2 - Collimator Systems
WBS 1.3.3 - NuMI Multi-batch Operation
WBS 1.3.4 - Main Injector RF Upgrade
3. Cost & Schedule
Cost
Schedule
4.
Proton Projections
Send comments, suggestions to
The Pagemaster
Security, Privacy, Legal
Last Modified: August 28, 2006