Proton Plan Jan 05





Project Start:
Project Finish:
9/30/04
7/16/08


Tasks


UID
Task Name
DurationStartFinish% Complete
1
Proton Plan
951 d9/30/047/16/0823%
2
Linac Upgrades
774 d12/15/041/18/0818%
6
Linac PA Vulnerability
666 d12/15/048/10/0721%
281
Linac PA Task Force
416 d12/15/048/11/0635%
26
Linac Task Force: Phase 1
39 d12/15/042/14/05100%
27
Linac Task Force Phase 1 Report Issued
0 d2/14/052/14/05100%
34
Linac Task Force: Phase 2
97 d2/15/056/30/05100%
35
Linac Task Force Phase 2 Report Issued
0 d6/30/056/30/05100%
36
Linac Task Force 2
250 d8/15/058/11/060%
37
Linac Task Force 2 Complete
0 d8/11/068/11/060%
282
7835 Purchase
272 d2/18/053/20/0617%
28
Linac Task Force PA Prepare Order
21 d2/18/053/18/05100%
29
Linac Task Force PA Award Order
1 d3/21/053/21/05100%
30
Linac Task Force PA Delivery
105 d10/14/053/20/060%
799
Thales Prototype Facility
250 d8/14/068/10/070%
8
Linac Quad Power Supplies
765 d1/3/051/18/0825%
211
Linac Quad PS: Design & Prototype
149 d1/3/058/2/05100%
236
Linac Quad PS Conceptual Specifications
148 d1/3/058/1/05100%
237
Linac Quad PS Conceptual 300 amp Test
85 d4/1/058/1/05100%
415
Linac Quad PS Conceptual Review Prototype
1 d8/2/058/2/05100%
238
Linac Quad PS Conceptual Design
87 d3/1/056/30/05100%
239
Linac Quad PS Conceptual Inductor Design
87 d3/1/056/30/05100%
777
Linac Quad PS Project Decision
0 d8/1/058/1/05100%
240
Linac Quad PS Upgrade - Card Replacement
574 d10/3/051/18/080%
778
Linac Quad PS Upgrade Design
170 d10/3/056/7/060%
779
Linac Quad PS Upgrade Drafting
110 d2/2/067/7/060%
780
Linac Quad PS Upgrade Procurement
420 d4/3/0611/28/070%
708
Linac Quad PS Upgrade Test
250 d12/18/0612/14/070%
709
Linac Quad PS Upgrade Install
250 d1/23/071/18/080%
710
Linac Quad PS Upgrade Installation Complete
0 d1/18/081/18/080%
459
200 Mhz LLRF Upgrade
522 d9/1/0510/1/070%
786
200 Mhz LLRF Engineering
271 d9/1/059/29/060%
460
200 Mhz LLRF Modeling
125 d9/1/053/6/060%
468
200 Mhz LLRF Engineering
250 d10/3/059/29/060%
781
200 Mhz LLRF Design Review
1 d2/7/062/7/060%
787
200 Mhz LLRF Procure/Assy/Test/Install
232 d9/29/068/31/070%
712
200 Mhz LLRF Procurement
84 d10/2/062/5/070%
713
200 Mhz LLRF Assembly
125 d9/29/064/2/070%
714
200 Mhz LLRF Testing
125 d11/30/065/31/070%
715
200 Mhz LLRF Installation
20 d8/6/078/31/070%
718
200 Mhz LLRF Commissioning
20 d9/4/0710/1/070%
716
200 Mhz LLRF Installation Complete
0 d10/1/0710/1/070%
3
Booster Upgrades
951 d9/30/047/16/0817%
737
Booster RF Duty Cycle Limits & Means of Improving Booster RF Reliability for 9Hz Operation
43 d8/8/0510/6/050%
732
Feasibility of Booster RF Operating @ 9Hz
43 d8/8/0510/6/050%
9
Determine Duty Cycle Limit for Booster West Gallery Transformer (Y02-US-01)
10 d8/8/058/19/050%
733
Investigate Reprogramming Ferrite Bias Program to Reduce RMS Current
21 d8/8/059/6/050%
734
Determine Duty Cycle Limit for Booster West Gallery Ferrite Bias Supply Transformers
21 d8/8/059/6/050%
735
Review Duty Cycle Limit Study Results w/FESS Engineering Electrical Consultant
1 d9/7/059/7/050%
740
Document Findings & Recommendations w/Report
21 d9/8/0510/6/050%
741
Booster RF Report Issued
0 d10/6/0510/6/050%
736
Strategies for Improving Booster RF Reliability @ 9Hz
21 d8/8/059/6/050%
738
Review Station Down Time for Determining Equip Vulnerability
5 d8/8/058/12/050%
739
Develop Action Plan to Improve Reliability
21 d8/8/059/6/050%
10
OrBump System
328 d9/30/041/25/0668%
38
OrBump System Magnets Design & Production
283 d9/30/0411/14/0576%
202
OrBump Magnet TD Division FY04 Costs
1 d9/30/049/30/04100%
139
OrBump Magnets
255 d10/1/0410/6/0585%
137
Design OrBump Magnets (3+3 spares)
240 d10/1/049/15/0597%
138
Procure Components & Tooling for OrBump Magnets (3+3 spares)
157 d2/4/059/15/0594%
100
Assemble, Test & Rework 1st Article OrBump Magnet
240 d10/1/049/15/0590%
101
Assemble Final 5 OrBump Magnets (2+3 spares)
144 d2/23/059/15/0558%
102
Test Final 5 OrBump Magnets (2+3 spares) (AD)
15 d9/16/0510/6/050%
305
OrBump Magnets Ready for Install on Girder
0 d10/6/0510/6/050%
142
OrBump Stripline
136 d4/1/0510/12/0559%
143
Design OrBump Stripline
105 d4/1/058/29/0580%
144
Procure OrBump Stripline
22 d8/22/059/21/050%
145
Assemble OrBump Stripline
15 d9/22/0510/12/050%
306
OrBump Stripline Assy Complete
0 d10/12/0510/12/050%
146
OrBump Girder
159 d4/1/0511/14/0545%
147
Design OrBump Girder Assembly
100 d4/1/058/22/0575%
148
Procure OrBump Girder Assembly
45 d7/29/059/30/055%
140
Mount OrBump Components on Girder
22 d10/7/0511/7/050%
141
Survey OrBump Magnets & Girder
5 d11/8/0511/14/050%
307
OrBump Girder Assy Complete
0 d11/14/0511/14/050%
39
OrBump System Power Supply
204 d1/25/0511/9/0558%
40
OrBump P.S. Specifications
5 d1/25/051/31/05100%
41
OrBump P.S. Simulations
10 d2/1/052/14/05100%
404
OrBump P.S. Design Review Preparation
21 d5/9/056/7/05100%
405
OrBump P.S. Design Review
1 d6/15/056/15/05100%
45
OrBump P.S. Cabinet Layout
65 d6/1/058/31/0550%
46
OrBump P.S. General Procurement
130 d3/1/058/31/0594%
42
OrBump P.S. Procure Capacitors
141 d2/15/059/1/0520%
44
OrBump Charging Power Supply Assembly
101 d4/11/058/31/0590%
47
OrBump P.S. Cabinet Assembly
25 d9/27/0510/31/050%
43
OrBump P.S. Assemble Controls
70 d6/17/059/26/0532%
278
OrBump P.S. Initial Testing
7 d11/1/0511/9/050%
309
OrBump Power Supply Ready for Installation
0 d11/9/0511/9/050%
342
OrBump Syst Installation
163 d5/2/0512/21/0556%
175
Installation
21 d11/10/0512/12/050%
176
Install OrBump Power Supply
7 d11/10/0511/18/050%
177
Install OrBump Magnet System
8 d11/16/0511/29/050%
178
Pull Cables/Terminate/Install Head
2 d11/23/0511/28/050%
180
OrBump System Survey
7 d11/30/0512/8/050%
308
OrBump System Installation Complete
0 d12/12/0512/12/050%
386
400 MEV Line Reconfiguration
163 d5/2/0512/21/0571%
387
400 MeV Beamline Design
60 d5/2/057/26/05100%
388
400 MeV Optics Design
21 d5/2/055/31/05100%
389
400 MeV Beam Sheet
2 d7/14/057/15/05100%
456
400 MeV Drawing
7 d7/18/057/26/05100%
452
400 MeV Alignment
137 d6/1/0512/14/0586%
453
400 MeV Beam Sheet Based on As-found '04
30 d6/1/057/13/05100%
454
400 MeV Delimiter New Stationing
1 d11/23/0511/23/050%
455
400 MeV Survey
4 d12/9/0512/14/050%
390
400 MeV Installation
31 d11/7/0512/21/050%
391
400 MeV Vent Vacuum/Disconnect Electrical/LCW
2 d11/7/0511/8/050%
442
400 MeV Remove Magnets & Other Components
5 d11/9/0511/15/050%
445
400 MeV Install Magnets & Other Components
5 d11/30/0512/6/050%
446
400 MeV Connect Vacuum System/Pump Down/Leak Check
3 d12/15/0512/19/050%
447
400 MeV Connect Water/Electrical
2 d12/20/0512/21/050%
448
400 MeV Electrical
2 d12/7/0512/8/050%
449
400 MeV Isolate MH2 Power Cables
1 d12/7/0512/7/050%
450
400 MeV MH2 PS Change Gain
1 d12/8/0512/8/050%
789
Commission OrBump System
10 d1/11/061/25/060%
791
OrBump System Commissioned
0 d1/25/061/25/060%
11
Corrector System
889 d1/4/057/16/082%
74
Corrector Magnets Design & Prototype
387 d1/4/057/17/0616%
800
Initial Corrector Prototype Design & Fab
146 d1/4/057/29/05100%
60
Design Corrector Prototype
223 d8/1/056/20/060%
61
Corrector Prototype Procurement
254 d3/1/053/3/062%
67
Corrector Prototype Production
294 d4/12/056/12/062%
73
Corrector Prototype Test
63 d4/18/067/17/060%
310
Corrector Prototype Magnet Complete
0 d7/17/067/17/060%
698
Corr Prototype Design Complete
0 d6/20/066/20/060%
75
Vert Corr Magnets Production
270 d7/6/068/1/070%
339
Vert Corr Magnets Design & Procurement
236 d7/19/066/26/070%
184
Design Vert Corr Production Units (24)
10 d7/19/068/1/060%
76
Procure Vert Corr Components
226 d8/2/066/26/070%
340
Vert Corr Magnets Fab & Test
270 d7/6/068/1/070%
77
Fabricate Vert Corr Production Units (24)
149 d12/13/067/18/070%
185
Test Vert Corr Production Units
270 d7/6/068/1/070%
222
Vert Corr Integrated BPMs
140 d12/13/067/5/070%
312
Vert Corr Magnets Ready for Installation
0 d8/1/078/1/070%
469
Corrector PS Design & Prototype
286 d8/1/059/19/060%
470
Magnet Power Supplies -- 50 Amp, PS1
236 d8/1/057/10/060%
471
PS1: Specification
20 d8/1/058/26/050%
472
PS1: Identify Vendors
4 d8/29/059/1/050%
473
PS1: Vendor Specification Review
1 d9/16/059/16/050%
474
PS1: Request For Inquiry Bids
1 d9/23/059/23/050%
475
PS1: Procurement of Vendor Model
1 d12/20/0512/20/050%
476
PS1: Prototype In-House PS Design
120 d9/19/053/14/060%
477
PS1: Prototype Fabrication
1 d5/23/065/23/060%
478
PS1: Prototype Testing
30 d5/24/067/6/060%
479
PS1: Approval For Production
2 d7/7/067/10/060%
480
Magnet Power Supplies -- 5 Amp, PS2
136 d8/1/052/16/060%
481
PS2: Specification
20 d8/1/058/26/050%
482
PS2: Identify Vendors
4 d8/29/059/1/050%
483
PS2: Vendor Specification Review
1 d9/16/059/16/050%
484
PS2: Request For Inquiry Bids
1 d9/23/059/23/050%
485
PS2: Integration of PS into system
20 d9/19/0510/14/050%
486
PS2: Prototype Fabrication
1 d12/29/0512/29/050%
487
PS2: Prototype Testing
30 d1/3/062/14/060%
488
PS2: Approval For Production
2 d2/15/062/16/060%
489
Corrector Controller Design & Prototype, PCC
74 d2/1/065/15/060%
490
CC: Specification
4 d2/1/062/6/060%
491
CC: Prototype Schematic Layout
10 d2/7/062/20/060%
492
CC: Prototype Parts Procurement
1 d4/3/064/3/060%
493
CC: Prototype PCB Layout
20 d2/21/063/20/060%
494
CC: Prototype PCB Fabrication
1 d4/10/064/10/060%
495
CC: Prototype Assembly, 5 Units
3 d4/11/064/13/060%
496
CC: Prototype Testing
10 d4/14/064/27/060%
497
CC: Prototype Approval
2 d4/28/065/1/060%
498
CC: Production Schematic Revisions
4 d5/2/065/5/060%
499
CC: Teststand Assembly
10 d5/2/065/15/060%
500
Local Display Design & Prototype
63 d6/21/069/19/060%
501
DD: Specification & Layout
15 d6/21/067/12/060%
502
DD: Hardware / Enclosure Design
2 d7/13/067/14/060%
503
DD: Prototype Schematic Layout
10 d7/17/067/28/060%
504
DD: Prototype Parts Procurement
1 d9/11/069/11/060%
505
DD: Prototype PCB Layout
10 d7/31/068/11/060%
506
DD: Prototype PCB Fabrication
1 d9/1/069/1/060%
507
DD: Prototype Assembly, 2 Units
2 d9/12/069/13/060%
508
DD: Prototype Testing
1 d9/14/069/14/060%
509
DD: Prototype Approval
1 d9/15/069/15/060%
510
DD: Production Schematic Revisions
2 d9/18/069/19/060%
511
Verticle Corrector PS Fabrication
209 d4/27/062/27/070%
512
Vert Corr PS Production -- 50 Amp, PS1
158 d7/11/062/27/070%
513
Vert Corr PS1: Production Specification & Vendor Selection
10 d7/11/067/24/060%
514
Vert Corr PS1: Production Oversight
100 d7/25/0612/14/060%
748
Vert Corr PS1: Procurement Awarded
1 d7/24/067/24/060%
515
Vert Corr PS1: Production Order Fabrication & Delivery, 120 Units
48 d9/20/0611/28/060%
516
Vert Corr PS1: Production Order Testing
48 d12/15/062/27/070%
517
Vert Corr PS Production -- 5 Amp, PS2
25 d4/27/066/1/060%
518
Vert Corr PS2: Production Order Fabrication, 24 Units
1 d4/27/064/27/060%
519
Vert Corr PS2: Production Order Testing
24 d4/28/066/1/060%
520
Verticle Corrector Installation
494 d2/1/061/18/080%
521
Vert Corr PS & Controls Rack Assembly
390 d2/1/068/16/070%
522
CAMAC Vert Corr Controller, CC
75 d5/8/068/22/060%
523
Vert Corr CC: Production Parts Procurement, 36 Units
1 d6/19/066/19/060%
524
Vert Corr CC: Production PCB Layout
10 d5/8/065/19/060%
525
Vert Corr CC: Production PCB Fabrication, 36 Units
1 d6/19/066/19/060%
526
Vert Corr CC: Production Assembly, 36 Units
40 d6/20/068/15/060%
527
Vert Corr CC: Production Testing
40 d6/27/068/22/060%
528
Vert Corr Local Displays & Diagnostics, DD
59 d9/18/0612/11/060%
529
Vert Corr DD: Production Parts Procurement, 36 units
1 d10/31/0610/31/060%
530
Vert Corr DD: Production PCB Layout
5 d9/20/069/26/060%
531
Vert Corr DD: Production PCB Fabrication, 36 Units
1 d10/17/0610/17/060%
532
Vert Corr DD: Production Assembly, 36 Units
9 d11/1/0611/13/060%
533
Vert Corr DD: Production Testing
18 d11/14/0612/11/060%
534
Vert Corr DD: Documentation
20 d9/18/0610/13/060%
535
Vert Corr Rack Installation, RI
390 d2/1/068/16/070%
536
Vert Corr RI: Identify New Rack Locations
2 d7/19/067/20/060%
537
Vert Corr RI: Specify Rack Layout & Cooling
10 d7/21/068/3/060%
538
Vert Corr RI: Create Drawings for Rack Layout
5 d8/4/068/10/060%
539
Vert Corr RI: Prepare New Rack Locations
5 d2/1/062/7/060%
540
Vert Corr RI: Transport Racks from Storage
5 d2/8/062/14/060%
541
Vert Corr RI: Prepare Racks with Equip. Support Hardware
5 d8/11/068/17/060%
542
Vert Corr RI: AC Power Installation
21 d8/18/069/18/060%
543
Vert Corr RI: Install Rack Cooling
5 d9/19/069/25/060%
544
Vert Corr RI: Install Bulk Power Supplies, 6 each 15kW Units
5 d9/19/069/25/060%
545
Vert Corr RI: Install Power Amplifiers
10 d2/28/073/13/070%
546
Vert Corr RI: Install Controls & Diagnostic Equip.
40 d3/14/075/8/070%
547
Vert Corr RI: Power Amplifier Test Design & Hazard Analysis
10 d8/11/068/24/060%
548
Vert Corr RI: Test Interlocks
10 d5/9/075/22/070%
549
Vert Corr RI: Test Power Amplifiers w/Load
40 d5/23/077/19/070%
550
Vert Corr RI: Test Controls
20 d7/20/078/16/070%
551
Vert Corr Cabling, CBL
95 d7/11/0611/21/060%
552
Vert Corr CBL: Specify Power Cables & Connectors
4 d7/11/067/14/060%
553
Vert Corr CBL: Bid & Procure Power Cables
1 d9/25/069/25/060%
554
Vert Corr CBL: Procure Power Cable Connectors
1 d11/6/0611/6/060%
555
Vert Corr CBL: Power Cable is Delivered
1 d11/7/0611/7/060%
556
Vert Corr CBL: Pull Power Cables from Racks to Magnets
10 d11/8/0611/21/060%
557
Vert Corr CBL: Specifying Control Cables & Connectors
8 d7/11/067/20/060%
558
Vert Corr CBL: Procure Control Cable & Connectors
1 d8/31/068/31/060%
559
Vert Corr CBL: Routing Control Cables
4 d9/1/069/7/060%
560
Vert Corr CBL: Terminating Control Cables
40 d9/8/0611/2/060%
561
Vert Corrector Magnet Installation
395 d6/21/061/18/080%
562
Vert Corr Booster Modification (BM)
294 d6/21/068/21/070%
567
Vert Corr BM: Design of New LS Spool Piece
10 d6/21/067/5/060%
750
Vert Corr BM: Procure & Machining of Initial LS Spool Piece
1 d8/30/068/30/060%
751
Vert Corr BM: Assembly of Initial LS Spool Piece
4 d8/31/069/6/060%
752
Vert Corr BM: LS Initial Spool Piece Examination in Booster Enclosure
6 d9/7/069/14/060%
753
Vert Corr BM: Develop Drawings for Long Straight
10 d9/15/069/28/060%
568
Vert Corr BM: Procure & Machining of LS Spool Piece Components
1 d9/29/069/29/060%
569
Vert Corr BM: Enclosure Installation Hazard Analysis
12 d7/6/067/21/060%
570
Vert Corr BM: Enclosure Work Safety Review
2 d7/24/067/25/060%
572
Vert Corr BM: Removal of Long Straight Sections
12 d8/6/078/21/070%
584
Corrector Long (Verticle - Phase 1) Straight Spool Piece Assy, CLS
324 d10/2/061/18/080%
585
Vert Corr CLS: Component Inspection & Cleaning
3 d10/2/0610/4/060%
586
Vert Corr CLS: Spool Piece Welding & Assy Upstairs
9 d10/5/0610/17/060%
587
Vert Corr CLS: Spool Piece Leak Checking
9 d10/19/0610/31/060%
588
Vert Corr CLS: Spool Piece Assy in Booster Enclosure
6 d8/24/078/31/070%
589
Vert Corr CLS: Corrector Cooling Water Connection
6 d11/2/0711/9/070%
590
Vert Corr CLS: Spool Piece Cabling
6 d11/12/0711/19/070%
591
Vert Corr CLS: Spool Piece Power Testing
6 d11/20/0711/27/070%
592
Vert Corr CLS: Corrector & BPM Alignment
6 d11/28/0712/7/070%
700
Vertical Corrector Installation Complete
0 d1/18/081/18/080%
593
Cooling Water Plumbing, LCW
326 d7/19/0611/1/070%
594
Vert Corr LCW: Water Circuit Design
20 d7/19/068/15/060%
595
Vert Corr LCW: Procurement of Materials, Phase 1 All w/Long
1 d9/27/069/27/060%
596
Vert Corr LCW: Tee in to Existing Header ( Phase 1) All w/Long
7 d9/28/0610/6/060%
597
Vert Corr LCW: Procurement of Materials, Phase 2
1 d9/28/069/28/060%
598
Vert Corr LCW: Build Sub-Headers & Leads, Phase 2
24 d10/1/0711/1/070%
758
Vert Corr Applications Software Development
376 d7/19/061/18/080%
759
Vert Corr Appl SW Dev: Specifications
63 d7/19/0610/16/060%
761
Vert Corr Appl SW Dev: Crate Level DAQ Software Development
63 d10/17/061/22/070%
760
Vert Corr Appl SW Dev: Application Programming
250 d1/23/071/18/080%
687
Horiz Corr Magnets Production
270 d7/6/068/1/070%
688
Horiz Corr Magnets Design & Procurement
236 d7/19/066/26/070%
689
Design Horiz Corr Production Units (24)
10 d7/19/068/1/060%
690
Procure Horiz Corr Components
226 d8/2/066/26/070%
693
Horiz Corr Magnets Fab & Test
270 d7/6/068/1/070%
694
Fabricate Horiz Corr Production Units (24)
149 d12/13/067/18/070%
695
Test Horiz Corr Production Units
270 d7/6/068/1/070%
696
Horiz Corr Integrated BPMs
140 d12/13/067/5/070%
697
Horiz Corr Magnets Ready for Installation
0 d8/1/078/1/070%
599
Horizontal Corrector PS Fabrication
209 d4/27/062/27/070%
600
Horiz Corr PS Production -- 50 Amp, PS1
158 d7/11/062/27/070%
601
Horiz Corr PS1: Production Specification & Vendor Selection
10 d7/11/067/24/060%
602
Horiz Corr PS1: Production Oversight
100 d7/25/0612/14/060%
749
Horiz Corr PS1: Procurement Awarded
1 d7/25/067/25/060%
603
Horiz Corr PS1: Production Order Fabrication, 120 Units
48 d9/21/0611/29/060%
604
Horiz Corr PS1: Production Order Testing
48 d12/15/062/27/070%
605
Horiz Corr PS Production -- 5 Amp, PS2
25 d4/27/066/1/060%
606
Horiz Corr PS2: Production Order Fabrication, 24 Units
1 d4/27/064/27/060%
607
Horiz Corr PS2: Production Order Testing
24 d4/28/066/1/060%
608
Horizontal Corrector Installation
494 d2/1/061/18/080%
609
Horiz Corr PS & Controls Rack Assembly
390 d2/1/068/16/070%
610
CAMAC Horiz Corr Controller, CC
75 d5/8/068/22/060%
611
Horiz Corr CC: Production Parts Procurement, 36 Units
1 d6/19/066/19/060%
612
Horiz Corr CC: Production PCB Layout
10 d5/8/065/19/060%
613
Horiz Corr CC: Production PCB Fabrication, 36 Units
1 d6/19/066/19/060%
614
Horiz Corr CC: Production Assembly, 36 Units
40 d6/20/068/15/060%
615
Horiz Corr CC: Production Testing
40 d6/27/068/22/060%
616
Horiz Corr Local Displays & Diagnostics, DD
59 d9/18/0612/11/060%
617
Horiz Corr DD: Production Parts Procurement, 36 units
1 d10/31/0610/31/060%
618
Horiz Corr DD: Production PCB Layout
5 d9/20/069/26/060%
619
Horiz Corr DD: Production PCB Fabrication, 36 Units
1 d10/17/0610/17/060%
620
Horiz Corr DD: Production Assembly, 36 Units
9 d11/1/0611/13/060%
621
Horiz Corr DD: Production Testing
18 d11/14/0612/11/060%
622
Horiz Corr DD: Documentation
20 d9/18/0610/13/060%
623
Horiz Corr Rack Installation, RI
390 d2/1/068/16/070%
624
Horiz Corr RI: Identify New Rack Locations
2 d7/19/067/20/060%
625
Horiz Corr RI: Specify Rack Layout & Cooling
10 d7/21/068/3/060%
626
Horiz Corr RI: Create Drawings for Rack Layout
5 d8/4/068/10/060%
627
Horiz Corr RI: Prepare New Rack Locations
5 d2/1/062/7/060%
628
Horiz Corr RI: Transport Racks from Storage
5 d2/8/062/14/060%
629
Horiz Corr RI: Prepare Racks with Equip. Support Hardware
5 d2/15/062/21/060%
630
Horiz Corr RI: AC Power Installation
21 d2/22/063/22/060%
631
Horiz Corr RI: Install Rack Cooling
5 d3/23/063/29/060%
632
Horiz Corr RI: Install Bulk Power Supplies, 6 each 15kW Units
5 d3/23/063/29/060%
633
Horiz Corr RI: Install Power Amplifiers
10 d2/28/073/13/070%
634
Horiz Corr RI: Install Controls & Diagnostic Equip.
40 d3/14/075/8/070%
635
Horiz Corr RI: Power Amplifier Test Design & Hazard Analysis
10 d8/11/068/24/060%
636
Horiz Corr RI: Test Interlocks
10 d5/9/075/22/070%
637
Horiz Corr RI: Test Power Amplifiers w/Load
40 d5/23/077/19/070%
638
Horiz Corr RI: Test Controls
20 d7/20/078/16/070%
639
Horiz Corr Cabling, CBL
95 d7/11/0611/21/060%
640
Horiz Corr CBL: Specify Power Cables & Connectors
4 d7/11/067/14/060%
641
Horiz Corr CBL: Bid & Procure Power Cables
1 d9/25/069/25/060%
642
Horiz Corr CBL: Procure Power Cable Connectors
1 d11/6/0611/6/060%
643
Horiz Corr CBL: Power Cable is Delivered
1 d11/7/0611/7/060%
644
Horiz Corr CBL: Pull Power Cables from Racks to Magnets
10 d11/8/0611/21/060%
645
Horiz Corr CBL: Specifying Control Cables & Connectors
8 d7/11/067/20/060%
646
Horiz Corr CBL: Procure Control Cable & Connectors
1 d8/31/068/31/060%
647
Horiz Corr CBL: Routing Control Cables
4 d9/1/069/7/060%
648
Horiz Corr CBL: Terminating Control Cables
40 d9/8/0611/2/060%
649
Horiz Corrector Magnet Installation
395 d6/21/061/18/080%
650
Horiz Corr Booster Modification, BM
294 d6/21/068/21/070%
651
Horiz Corr BM: Design of New Short Straight Support
10 d7/6/067/19/060%
653
Horiz Corr BM: Design of New SS Spool Piece
10 d6/21/067/5/060%
754
Horiz Corr BM: Procure & Machining of Initial SS Spool Piece
1 d9/14/069/14/060%
755
Horiz Corr BM: Assembly of Initial SS Spool Piece
4 d9/15/069/20/060%
756
Horiz Corr BM: SS Initial Spool Piece Examination in Booster Enclosure
6 d9/21/069/28/060%
757
Horiz Corr BM: Develop Drawings for Short Straight
10 d9/29/0610/12/060%
652
Horiz Corr BM: Procurement & Machining of SS Support
1 d12/11/0612/11/060%
654
Horiz Corr BM: Procure & Machining of SS Spool Piece Components
1 d12/11/0612/11/060%
657
Horiz Corr BM: Enclosure Installation Hazard Analysis
12 d7/20/068/4/060%
658
Horiz Corr BM: Enclosure Work Safety Review
2 d8/7/068/8/060%
660
Horiz Corr BM: Removal of Short Straight Sections
12 d8/6/078/21/070%
662
Corrector Short (Horizontal - Phase 2) Straight Spool Piece Assy, CSS
375 d7/20/061/18/080%
663
Horiz Corr CSS: Assembly & Installation Planning & Hazard Analysis
5 d7/20/067/26/060%
664
Horiz Corr CSS: Component Inspection & Cleaning
3 d12/12/0612/14/060%
665
Horiz Corr CSS: Spool Piece Welding & Assy Upstairs
6 d12/15/0612/26/060%
666
Horiz Corr CSS: Spool Piece Leak Checking
6 d12/18/0612/27/060%
667
Horiz Corr CSS: Spool Piece Assy in Booster Enclosure
6 d8/24/078/31/070%
668
Horiz Corr CSS: Corrector Cooling Water Connection
6 d11/2/0711/9/070%
669
Horiz Corr CSS: Spool Piece Cabling
6 d11/12/0711/19/070%
670
Horiz Corr CSS: Spool Piece Power Testing
6 d11/20/0711/27/070%
671
Horiz Corr CSS: Corrector & BPM Alignment
6 d11/28/0712/7/070%
699
Horizontal Correctors Installation Complete
0 d1/18/081/18/080%
681
Horiz Corr Cooling Water Plumbing, LCW
326 d7/19/0611/1/070%
682
Horiz Corr LCW: Water Circuit Design
20 d7/19/068/15/060%
685
Horiz Corr LCW: Procurement of Materials, Phase 2 Split betw Long & Short
1 d9/27/069/27/060%
686
Horiz Corr LCW: Build Sub-Headers & Leads (Phase 2) Split betw Long & Short
24 d10/1/0711/1/070%
764
Horiz Corr Applications Software Development
376 d7/19/061/18/080%
765
Horiz Corr Appl SW Dev: Specifications
63 d7/19/0610/16/060%
766
Horiz Corr Appl SW Dev: Crate Level DAQ Software Development
63 d10/17/061/22/070%
767
Horiz Corr Appl SW Dev: Application Programming
250 d1/23/071/18/080%
768
Commission Corrector System
125 d1/22/087/16/080%
801
Corrector System Complete
0 d7/16/087/16/080%
769
Vert Corr AIP Project Management
376 d7/19/061/18/080%
770
Horiz Corr AIP Project Management
376 d7/19/061/18/080%
762
Prepare AIP Documentation
172 d8/1/054/7/060%
784
Corrector System Technical Review
1 d7/18/067/18/060%
763
Corrector AIPs Approved
0 d7/18/067/18/060%
729
Review Booster Modifications Design
1 d7/20/067/20/060%
785
Corrector System Installation Review
1 d3/1/073/1/070%
728
Corrector Magnets Spares Account (12 spares)
130 d9/16/053/27/060%
12
30 Hz Harmonic
432 d1/3/059/18/0634%
279
30 Hz Harmonic Prototype
412 d1/3/058/18/0644%
234
GMPS Modification
10 d8/7/068/18/060%
214
30 Hz Harmonic Prototype
232 d1/3/0511/30/0560%
426
Review 30 Hz Harmonic Prototype
1 d12/1/0512/1/050%
233
30 Hz Harmonic Project Decision
0 d12/1/0512/1/050%
230
30Hz Girder Design
114 d6/21/0512/1/0515%
280
30 Hz Harmonic Production
199 d12/2/059/18/060%
232
30Hz Procurement
75 d12/2/053/23/060%
333
30Hz Delivery
1 d8/1/068/1/060%
231
30Hz Installation
30 d8/7/069/18/060%
316
30Hz Installation Complete
0 d9/18/069/18/060%
13
Gamma-t System
681 d5/2/051/18/0812%
432
Gamma-t System Studies
168 d5/2/051/3/0625%
215
Gamma-t Studies
167 d5/2/0512/29/0525%
408
Gamma-t Studies Complete
0 d12/29/0512/29/050%
431
Gamma-t Review/Project Decision
1 d1/3/061/3/060%
433
New Gamma-t System
513 d1/4/061/18/080%
434
New Gamma-t System Design
42 d1/4/063/3/060%
435
New Gamma-t System Procure/Fab
125 d3/6/068/29/060%
436
New Gamma-t System Install
21 d12/17/071/18/080%
15
Booster RF Cavity Cooling
220 d1/4/0511/11/0580%
157
Stainless Steel Flex Tubes
220 d1/4/0511/11/0580%
155
Flex Tube Fab
39 d1/4/052/28/05100%
158
Re-Install Flex Tubes
10 d10/31/0511/11/050%
410
Flex Tube Installation Complete
0 d11/11/0511/11/050%
782
Booster Solid State RF Upgrade
1 d10/3/0510/3/050%
284
Booster Dump Relocation
173 d5/2/051/10/0635%
286
Booster Dump Relocation Design
86 d5/2/058/31/0580%
427
Review Booster Dump Relocation Design
1 d7/5/057/5/05100%
288
Misc Fabrication
10 d8/1/058/12/050%
287
Booster Dump Relocation Install
163 d5/16/051/10/0626%
730
Booster Dump Relocation Remove Shielding Wall
8 d10/31/0511/9/050%
289
Booster Dump Relocation Remove Existing MP01 Septum
1 d11/30/0511/30/050%
290
Booster Dump Relocation Install Replacement MP01 (Old MI-8) Septum
5 d10/31/0511/4/050%
383
Booster Dump Relocation Run Power to MP01 Septum
150 d6/1/051/6/0620%
384
Booster Dump Relocation Run Cooling Water to MP01
10 d10/31/0511/11/050%
291
Booster Dump Relocation Remove Booster Kickers
1 d11/7/0511/7/050%
292
Booster Dump Relocation Install Booster Kickers
5 d11/8/0511/14/050%
293
Booster Dump Relocation Relocate Power Supplies
10 d10/31/0511/11/050%
369
Booster Dump Relocation Remove Beam Pipe @Conduit Core Location
1 d10/31/0510/31/050%
803
Booster Dump Relocation Issue Request for Proposals on Conduit Construction
20 d7/1/057/29/05100%
294
Booster Dump Relocation Install Conduit
15 d11/1/0511/21/050%
368
Booster Dump Relocation Terminate/Splice Cables/Controls
3 d11/22/0511/28/050%
295
Booster Dump Relocation Install Dump
2 d10/31/0511/1/050%
296
Booster Dump Relocation Radiation Safety Modifications
149 d5/16/0512/15/0532%
418
Booster Dump Relocation Install Dump Switch for V803
22 d10/31/0512/1/050%
419
Booster Dump Relocation Pull Cables for V803
10 d12/2/0512/15/050%
788
Booster Dump Relocation Installation of Beam Dump
3 d10/31/0511/2/050%
420
Booster Dump Relocation Beam Stop Design/Fabrication
97 d5/16/059/30/0550%
421
Booster Dump Relocation Install Beam Stop
10 d10/31/0511/11/050%
422
Booster Dump Relocation Recable Interlock Chassis & Test
10 d10/31/0511/11/050%
297
Booster Dump Relocation Alignment
2 d1/9/061/10/060%
322
Booster Dump Relocation Installation Complete
0 d1/10/061/10/060%
285
Booster Chopper
251 d10/3/0510/2/060%
372
Specify Booster Chopper
42 d10/3/0512/1/050%
797
Booster Chopper Device
183 d12/2/058/24/060%
792
Design Booster Chopper Magnet
63 d12/5/053/8/060%
428
Review Booster Chopper
1 d12/2/0512/2/050%
373
Booster Chopper Procurement
55 d3/9/065/24/060%
374
Booster Chopper Material Delivery
1 d5/25/065/25/060%
375
Fab Booster Chopper
63 d5/26/068/24/060%
793
Booster Chopper PS
125 d12/2/056/2/060%
794
Booster Chopper PS Design
42 d12/2/052/6/060%
795
Booster Chopper PS Procure
63 d2/7/065/4/060%
796
Booster Chopper PS Assemble
21 d5/4/066/2/060%
376
Test Booster Chopper w/Power Supply
21 d8/25/069/25/060%
377
Booster Chopper Installation
231 d10/31/0510/2/060%
370
Remove Pinger Kickers (2) at Long 5
1 d10/31/0510/31/050%
371
Install Booster Chopper
2 d9/26/069/27/060%
798
Install Power Supply
2 d6/5/066/6/060%
378
Electrical Hook-up
1 d9/28/069/28/060%
379
Alignment
1 d9/29/069/29/060%
380
Vacuum Pump Down
1 d10/2/0610/2/060%
381
Booster Chopper Installed
0 d10/2/0610/2/060%
438
Booster RF Reliability Improvements
280 d8/22/0510/2/060%
731
Booster AC Pulsed Power Transformer Replacement
280 d8/22/0510/2/060%
439
Booster AC Pulsed Power Transformer Purchase (3)
125 d8/22/052/22/060%
440
Booster AC Pulsed Power Cabinet & Switchboard Purchase (2)
85 d10/18/052/22/060%
441
New Transformers & Dist Cabinets (2)
272 d9/1/0510/2/060%
743
Design New Pads w/Containment
63 d9/1/0512/1/050%
745
Remove Old Transformers & Switchboards
6 d8/7/068/14/060%
744
Civil Construction of New Pads & Containment
30 d8/7/069/18/060%
746
Install New Transformers & Switchboards
15 d9/12/0610/2/060%
802
Booster AC Pulsed Transformer Installation Complete
0 d10/2/0610/2/060%
747
Booster RF Equip Upgrades to Improve Reliability
1 d8/7/068/7/060%
4
Main Injector Upgrades
568 d9/30/041/9/0743%
19
Large Aperture Quads - WQB
478 d9/30/048/25/0661%
204
WQB Fabrication
345 d9/30/042/17/0673%
203
WQB TD Division FY04 Costs
1 d9/30/049/30/04100%
86
WQB Design
218 d10/1/048/15/0598%
411
WQB Design Complete
0 d8/15/058/15/050%
90
WQB Procurement
282 d10/11/0411/22/0598%
92
Procure WQB Tools
172 d10/11/046/17/05100%
91
Procure WQB Components
143 d2/1/058/22/0599%
336
WQB Components Delivery
158 d4/12/0511/22/0595%
94
WQB Production
256 d2/3/052/9/0652%
95
WQB Produce Unit 1
142 d2/3/058/23/0597%
96
WQB Produce Units 2 - 7
125 d4/28/0510/24/0546%
135
WQB Produce Units 8-9 (Spares)
111 d8/29/052/9/060%
97
WQB Test
130 d8/10/052/17/060%
98
WQB Test Unit 1
5 d9/9/059/15/050%
99
WQB Test Units 2 - 7
60 d8/10/0511/2/050%
136
WQB Test Units 8-9 (Spares)
65 d11/10/052/17/060%
412
WQB Ready for Installation
0 d11/2/0511/2/050%
104
WQB Install (AD)
341 d4/20/058/25/065%
106
WQB Align/Install (5 units)
30 d11/3/0512/16/050%
704
WQB Align/Install (Remaining 2 units)
15 d8/7/068/25/060%
283
WQB Misc Fabrication
42 d8/31/0510/28/050%
324
WQB Align/Install Complete
0 d12/16/0512/16/050%
430
Procure WQB BPM's Incl Cables & Cable Pulls
94 d4/20/058/31/0515%
772
Shutdown Preparation
78 d8/1/0511/17/050%
206
WQB Power Supplies
160 d5/2/0512/16/0562%
207
WQB P.S. Procurement
63 d5/2/057/29/05100%
208
WQB P.S. Fab
65 d6/30/059/30/0550%
210
WQB P.S. Testing
10 d10/3/0510/14/050%
413
WQB P.S. Ready for Installation
0 d10/14/0510/14/050%
209
WQB P.S. Install
15 d10/31/0511/18/050%
325
WQB P.S. Installation Complete
0 d11/18/0511/18/050%
414
WQBs System Installed
0 d12/16/0512/16/050%
20
Collimation Systems
464 d2/1/0512/1/0635%
218
Collimation Systems Design
464 d2/1/0512/1/0646%
107
MI Loss Studies
231 d2/1/0512/29/0549%
113
MI Loss Studies: Beam
191 d2/1/0510/28/0550%
110
MI Loss Studies: Simulation
204 d3/10/0512/29/0542%
115
MI Loss Study: Simulation
167 d5/2/0512/29/0520%
131
MI-8 Loss Study: Simulation
111 d3/10/058/15/0575%
109
Exploratory Residual Radiation Measurements
63 d2/1/054/28/05100%
134
Systematic Residual Radiation Measurements
178 d4/15/0512/29/0540%
111
MI-8 Collimation System Design & Commission
269 d2/15/053/10/0660%
117
Develop Concept for MI-8 Collimation System
79 d2/15/056/6/05100%
118
Review Concept for MI-8 Collimation System
1 d6/7/056/7/05100%
119
Design MI-8 Collimation System
60 d6/8/058/31/0550%
133
MI-8 Collimation System Commissioning
42 d1/11/063/10/060%
112
MI Collimation System Design & Commission
233 d1/3/0612/1/060%
121
Develop Concept for MI Collimation System
21 d1/3/062/1/060%
122
Review Concept for MI Collimation System
1 d2/2/062/2/060%
123
Design MI Collimation System
42 d2/3/064/3/060%
127
MI Collimation System Commissioning
42 d10/3/0612/1/060%
341
MI-8 Collimation Syst Procure/Fab/Install
108 d8/1/051/6/060%
252
Procure MI-8 Collimation System
63 d8/1/0510/27/050%
251
Fabricate MI-8 Collimation System
63 d9/13/0512/12/050%
120
Install MI-8 Collimators
15 d12/13/051/6/060%
326
MI-8 Collimators Installation Complete
0 d1/6/061/6/060%
338
MI Collimation Syst Procure/Fab/Install
120 d4/4/069/21/060%
253
Procure MI Collimation System
84 d4/4/068/1/060%
124
Fabricate MI Collimation System (Future Parent)
63 d6/2/068/30/060%
125
Install/Align MI Collimation System
15 d8/31/069/21/060%
327
MI Collimation System Install/Align Complete
0 d9/21/069/21/060%
126
Main Injector Loss Mitigation Complete
0 d12/1/0612/1/060%
21
NuMI Multibatch Operation
483 d2/7/051/9/0721%
219
Multi-batch Studies
483 d2/7/051/9/0736%
128
Mixed Mode Operation (5)
138 d2/18/059/1/0540%
129
Studies for NuMI Slip Stacking
125 d7/10/061/9/070%
703
Slip Stacking for NuMI Complete
0 d1/9/071/9/070%
130
Barrier Bucket R&D
358 d2/7/057/7/0651%
149
Barrier Bucket Cavity
197 d2/7/0511/11/0591%
150
Barrier Bucket Cavity Procurement
80 d2/7/055/27/05100%
151
Barrier Bucket Cavity Fabrication/Assembly
67 d5/31/059/1/0595%
152
Barrier Bucket Cavity Installation
10 d10/31/0511/11/050%
328
Barrier Bucket Cavity Installation Complete
0 d11/11/0511/11/050%
153
Barrier Bucket Commissioning
125 d1/11/067/7/060%
254
Injection Kicker Modifications (Cooling System)
133 d6/7/0512/14/055%
392
Inj Kicker Mods Design/Drafting & Procurement
98 d6/7/0510/24/058%
394
Load Temperature Control System Design
63 d6/7/059/2/055%
393
Load Resistor Design
26 d7/29/059/2/0525%
395
Procure Resistors & High Power Parts
80 d7/1/0510/24/055%
396
Procure Control Skid & Temperature Controls
35 d7/18/059/2/055%
402
Inj Kicker Mods Assemble/Test
55 d9/6/0511/21/050%
399
Assemble/Test Control Skid
38 d9/6/0510/27/050%
400
Assemble/Test Resistors
30 d10/11/0511/21/050%
726
Injection Kicker Mod Ready for Installation
0 d11/21/0511/21/050%
403
Inj Kicker Mods Installation
32 d10/28/0512/14/050%
397
Install Control Skid in MI-10 incl Power
5 d11/22/0511/30/050%
401
Install Low Conductivity Water for Control Skid
20 d10/28/0511/28/050%
398
Install Resistors on Magnet & Plumbing from Svc Bldg in Tunnel
15 d11/22/0512/14/050%
727
Injection Kicker Mods Complete
0 d11/30/0511/30/050%
255
Extraction Kicker Modifications
148 d11/1/056/6/060%
22
Main Injector RF Upgrade
255 d3/1/053/6/0653%
263
MI RF Upgrade Prototype
119 d3/1/058/16/0599%
55
Test MI RF Upgrade Prototype Cavity in MI
119 d3/1/058/16/0599%
271
High Intensity Beam Studies
26 d7/5/058/9/05100%
52
Upgrade MI RF Prototype Cavity
116 d3/1/058/11/05100%
773
MI RF Cavity Prototype Decision
0 d8/16/058/16/050%
774
MI RF Upgrade
125 d9/1/053/6/060%
775
MI RF Upgrade Study
125 d9/1/053/6/060%
776
MI RF Scope Decision
0 d3/6/063/6/060%
5
Management
870 d2/1/057/16/0816%
220
Management
870 d2/1/057/16/0816%
406
Management Reserve OP
1 d10/3/0510/3/050%
407
Management Reserve EQ
1 d10/3/0510/3/050%
59
Start 2005 Shutdown